
Marketplace Reorder Point Calculator
Know exactly when to reorder and how much, so marketplace stock never runs out while the next shipment is still on its way.
Stock-outs cost more than lost sales
When a marketplace listing goes out of stock, you lose sales, organic rank, ad momentum and often the Buy Box, and they take time to win back. Most stock-outs happen because the order was placed too late, not because demand was unknowable.
The reorder point is the stock level that should trigger your next purchase order: expected sales during the full lead time plus a safety buffer. This calculator includes marketplace inbound time, offers a simple and a statistical safety stock, and rounds the suggested order to your supplier’s MOQ.
Formulas behind the calculator
Every result comes from these formulas. Inputs marked as estimates in the calculator can be changed to match your own data.
- Total lead time
- Supplier lead time + Marketplace inbound time
- Lead-time demand
- Average daily sales × Total lead time
- Safety stock (days method)
- Average daily sales × Safety days
- Safety stock (statistical)
- Z × √(Lead time × σdemand² + Daily sales² × σlead time²)
- Reorder point
- Lead-time demand + Safety stock
- Days until reorder
- (On hand + Incoming − Reorder point) ÷ Daily sales
- Order quantity
- Reorder point + Daily sales × Cover days − Stock position, rounded up to MOQ
How to use the Marketplace Reorder Point Calculator
- Enter average daily sales from the last 30–60 days, ignoring stock-out days.
- Add supplier lead time and marketplace inbound time, the days until stock is sellable.
- Choose a safety stock method: days of cover or statistical with a service level.
- Enter current sellable stock and incoming units already on order.
- Set how many days each order should cover and your supplier MOQ.
- Click Calculate to see your reorder point, days of cover and when and how much to order.
Example calculation
These are the calculator’s default values, so you can follow the maths and then replace them with your own numbers.
Inputs used
| Average daily sales | 35 units |
| Supplier lead time | 18 days |
| Marketplace inbound time | 5 days |
| Safety stock method | Days of cover (simple) |
| Safety cover | 10 days |
| Service level | 95% |
| Daily demand std. dev. | 8 units |
| Lead time std. dev. | 3 days |
| Current sellable stock | 1,200 units |
| Already on order / in transit | 400 units |
| Stock to cover after delivery | 30 days |
| Supplier MOQ | 200 units |
Results
| Reorder point | 1,155 units |
| Days of cover | 45.7 days |
| Reorder in | 13 days |
| Order quantity when you reach the reorder point | 1,200 units |
Reading the result: You can wait about 12 days before placing the next order. Set a reminder when stock reaches 1,155 units.
Factors that affect your numbers
Sales velocity
Use a recent, clean average. Ads, sales events and seasonality can shift it quickly.
Supplier lead time
Include production, dispatch and transit. Imports need longer and more variable lead times.
Inbound and receiving
FBA and marketplace warehouses take days to receive stock, and longer at peak.
Demand variability
Spiky SKUs need more safety stock; the statistical method sizes it from data.
MOQ and cash
Large MOQs raise stock levels and storage costs. Balance them with cash flow.
Events
Raise safety stock ahead of Prime Day, festive sales and campaigns.
Why sellers use this calculator
- Never miss a reorder with a clear trigger level.
- Protect rank and Buy Box by avoiding stock-outs.
- Size safety stock to your actual variability.
- Respect MOQs in every suggested order.
- Plan FBA and marketplace inbound realistically.
- Download the CSV for purchase planning.
Frequently asked questions
What is the reorder point formula?
How much safety stock should I keep?
What service level should I choose?
How do I find the standard deviation of daily sales?
Should incoming stock count towards the reorder point?
How often should I recalculate?
Related calculators
Keep hero SKUs always in stock
Our e-commerce management and Seller Central management teams run replenishment and inbound planning for brands.
Get an inventory review →